An FCM-Based Dynamic Modelling of Integrated Project Delivery Implementation Challenges in Construction Projects

KAHVANDI, Zahra, Ehsan SAGHATFOROUSH, Ahad ZARERAVASAN a Taha MANSOURI

Základní údaje

Originální název

An FCM-Based Dynamic Modelling of Integrated Project Delivery Implementation Challenges in Construction Projects

Autoři

KAHVANDI, Zahra (364 Írán), Ehsan SAGHATFOROUSH (364 Írán), Ahad ZARERAVASAN (364 Írán, garant, domácí) a Taha MANSOURI (364 Írán)

Vydání

Lean Construction Journal, United States, Lean Construction Institute, 2018, 1555-1369

Další údaje

Jazyk

angličtina

Typ výsledku

Článek v odborném periodiku

Stát vydavatele

Spojené státy

Utajení

není předmětem státního či obchodního tajemství

Odkazy

URL

Kód RIV

RIV/00216224:14560/18:00106171

Organizace

Ekonomicko-správní fakulta – Masarykova univerzita – Repozitář

EID Scopus

2-s2.0-85062181962

Klíčová slova anglicky

Integrated Project Delivery (IPD); Fuzzy Cognitive Map (FCM); Challenges; Construction Projects; Dynamic Modelling
Změněno: 3. 2. 2024 04:05, RNDr. Daniel Jakubík

Anotace

V originále

Question: What are the Integrated Project Delivery Implementation challenges in construction projects, their interrelationships and their effects on the project time, cost and quality?Purpose: The Purpose of this study is applying an efficient method to determine the most important challenges to IPD implementation in construction industry, and also to evaluate the interrelationships among these challenges and their effects on the project time, cost, and quality.Research Method: This study models available Integrated Project Delivery challengesusing a real case data, through applying Fuzzy Cognitive Mapping technique.Findings: Results show that contractual factors have the major influence compared with others. This shows the significance of paying attention to why project stakeholders must be integrated throughout the project life cycle since early contract documentation stage.Limitations/Implications: This study is limited to the caseselectedfrom Tehran of Iran.Value for authors: This study is significantdue to identifying, classifying and determining the intensity of effects of IPD implementation challenges on cost, time, and quality of construction projects. It results in planning, resolving the challenges, enhancing the quality of constructions and lastly saving the construction cost and time.