An FCM-Based Dynamic Modelling of Integrated Project Delivery Implementation Challenges in Construction Projects
KAHVANDI, Zahra, Ehsan SAGHATFOROUSH, Ahad ZARERAVASAN a Taha MANSOURIZákladní údaje
Originální název
An FCM-Based Dynamic Modelling of Integrated Project Delivery Implementation Challenges in Construction Projects
Autoři
KAHVANDI, Zahra (364 Írán), Ehsan SAGHATFOROUSH (364 Írán), Ahad ZARERAVASAN (364 Írán, garant, domácí) a Taha MANSOURI (364 Írán)
Vydání
Lean Construction Journal, United States, Lean Construction Institute, 2018, 1555-1369
Další údaje
Jazyk
angličtina
Typ výsledku
Článek v odborném periodiku
Stát vydavatele
Spojené státy
Utajení
není předmětem státního či obchodního tajemství
Odkazy
Kód RIV
RIV/00216224:14560/18:00106171
Organizace
Ekonomicko-správní fakulta – Masarykova univerzita – Repozitář
EID Scopus
2-s2.0-85062181962
Klíčová slova anglicky
Integrated Project Delivery (IPD); Fuzzy Cognitive Map (FCM); Challenges; Construction Projects; Dynamic Modelling
Změněno: 3. 2. 2024 04:05, RNDr. Daniel Jakubík
Anotace
V originále
Question: What are the Integrated Project Delivery Implementation challenges in construction projects, their interrelationships and their effects on the project time, cost and quality?Purpose: The Purpose of this study is applying an efficient method to determine the most important challenges to IPD implementation in construction industry, and also to evaluate the interrelationships among these challenges and their effects on the project time, cost, and quality.Research Method: This study models available Integrated Project Delivery challengesusing a real case data, through applying Fuzzy Cognitive Mapping technique.Findings: Results show that contractual factors have the major influence compared with others. This shows the significance of paying attention to why project stakeholders must be integrated throughout the project life cycle since early contract documentation stage.Limitations/Implications: This study is limited to the caseselectedfrom Tehran of Iran.Value for authors: This study is significantdue to identifying, classifying and determining the intensity of effects of IPD implementation challenges on cost, time, and quality of construction projects. It results in planning, resolving the challenges, enhancing the quality of constructions and lastly saving the construction cost and time.